Gecko Robotics | Pulverized Coal Boiler Inspection

https://youtube.com/watch?v=2px47h1mJ9g

Forced outages were causing major issues for a 1300MW power plant located in KY. The plant experienced a tube leak in the lower furnace “coutant” slope of a boiler. After a manual inspection and boiler repairs, the leaks returned to the same area in under a month.

With pressure mounting, the senior engineer needed reliable and complete data. Knowing we could be on-site in 24 hours, he reached out to Gecko Robotics to take the guesswork out of their inspections.